Page 1
Regular Meeting January 8, 2019
Village of Marcellus Council Proceedings
President Ronald Welburn called the regular meeting of the Marcellus Village Council to order at 7:00 p.m. Trustees present: Simmons, Irwin, Thomas, Morlan, Oswalt and Webb.
Agenda:
Motion by Simmons, seconded by Oswalt, to approve the agenda as presented. Ayes: All. Nays: None. Motion carried.
Minutes:
Motion by Webb, seconded by Welburn, to approve and place on file the minutes of the December 26, 2018, Regular Meeting. Ayes: All. Nays: None. Motion carried.
Bills:
Motion by Morlan, supported by Simmons, to authorize the payment of bills in the amount of $24,125.55. Roll call vote — Ayes: Irwin, Thomas, Welburn, Morlan, Oswalt, Webb and Simmons. Nays: None. Motion carried.
Frank Renaldi — (Wightman & Associates, Inc.) Addresses Michigan's Lead and Copper Rule LCR)
Frank Renaldi of Wightman & Associates, Inc. addressed the Village Council and those in attendance regarding the State of Michigan’s Department of Environmental Quality (DEQ) Lead and Copper Rule (LCR). He provided an explanation and overview of the LCR and discussed the requirement that all municipalities in the State of Michigan implement and fund
the LCR replacements.
As Described on the State of Michigan DEQ website, “The purpose of the Lead and Copper Rule (LCR) is to protect public health by minimizing lead and copper levels in drinking water, primarily by reducing corrosivity. Lead and copper enter drinking water mainly from corrosion of lead and copper containing plumbing materials. The rule establishes an action level (AL) of 0.015 milligrams per liter (mg/L) for lead and 1.3 mg/L for copper based on a 90th percentile level of tap water samples. An action level exceedance is not a violation but triggers other requirements to minimize exposure to lead and copper in drinking water, that include water quality parameter monitoring, corrosion control treatment, source water monitoring/treatment, public education, and lead service line replacement. All community water supplies and nontransient noncommunity water supplies are subject to the LCR requirements.”
The Michigan Department of Environmental Quality (MDEQ) has recently finalized the new Lead and Copper Rule (LCR), which includes replacement of lead service lines (LSL’s) and galvanized services, which have been fed by service lines, which contain or did contain lead. The MDEQ has mandated the services be replaced by the Village, at its cost, toa minimum of 18” inside the building or to the nearest shutoff valve, whichever is shorter. The mandate includes a provision requiring prioritization of LSL replacements in the municipal water system Asset Management Plan (AMP).
Page 1 of 3
Page 2
Regular Meeting January 8, 2019
Village of Marcellus Council Proceedings
The MDEQ is requiring a preliminary inventory via record review by January 1, 2020 and a verified inventory via physical verification by January 1, 2025. The Village’s Department of Public Works (DPW)’s familiarity with the system and available records will be utilized to produce the required preliminary inventory and physical verification must be visual and will be performed by excavation and field documentation.
The Village has an Optimized Corrosion Control Treatment (OCCT) system and test results indicate lead is not present in the treated water reaching customers’ taps. Even with the treatment system in place, the MDEQ mandate requires the Village meet the average of 5% replacement of LSL’s per year starting in 2021. This mandate ensures if the OCCT system were to operate improperly, LSL’s would be replaced thereby eliminating them as source of exposure.
It is estimated there are 200 lead services in the Village to be replaced at an estimated cost of $3,000 each for a total estimated cost of $600,000 in 2018 dollars. Splitting the replacement cost over approximately 478 Residential Equivalent Units (REUs) over twenty years (assuming 2% inflation per year) comes to a total cost of $1,255/REU or $5.23/month/REU. As the Village is responsible for the cost of LSL replacement, it is prudent to begin allocating a portion of the Water System budget for replacement. To facilitate funding for the replacements, the Village should consider a resolution to increase water rates by $5.23 per REU per month.
Consent Agenda
Motion by Webb, supported by Thomas, to receive and place on file all items on the Consent Agenda. Ayes: All. Nays: None. Motion carried.
President's Report
CCSD Sheriff Behnke Email Response to Council Decision on the Cass County Sheriffs 2018 and Proposed 2019 Agreements
Motion by Webb, supported by Welburn to receive and place on file the email response from Cass County Sheriff Behnke’s email response to the Village Council’s decision to decline the Cass County Sheriff's offer for law enforcement services for 2019 and to decline the offer for law enforcement services at a $50.00 per hour over time rate until the Sheriff's department is able to hire a part-time officer for weekend duty. Ayes: All. Nays: None. Motion carried.
Clerk’s Report
Resolution 2019-01 Resolution Establishing Rates for Village Water Supply Service
Motion by Webb, supported by Simmons, to adopt Resolution 2019-01, thereby amending the water rates per each Residential Equivalency Unit (REU) as discussed and recommended by Frank Renaldi of Wightman & Associates, Inc., in order to comply with, support and fund the State of Michigan Department of Environmental Quality (DEQ) mandate, directing all
Page 2 of 3
Page 3
Regular Meeting January 8, 2019
Village of Marcellus Council Proceedings
municipalities to replace all lead service lines beginning in 2021. This resolution adds a per REU charge to the current 2019 rates as follows:
1. The water per REU base rate is $19.77/REU (unchanged). 2. The water LCR rate is added at $5.23/REU (new). 3. The “per gallon” rate is $5.41/1000 gallons (unchanged).
All rates will increase by 2.0% on January 1 of each year and first appearing on the January bill as established by the previous Resolution Establishing Rates for Village Water Supply Service (Resolution 2017-02).
Roll Call Vote - Ayes: Thomas, Welburn, Morlan, Oswalt, Webb, Simmons and Irwin. Nays: None. Motion carried.
Ordinance No. 230 Prohibition of Marijuana Establishments Ordinance
Motion by Webb, supported by Welburn, to adopt the proposed Prohibition of Marijuana Establishments Ordinance as Ordinance No. 230 as revised with an effective date of February 17, 2019. Roll Call Vote —- Ayes: Welburn, Morlan, Oswalt, Webb, Simmons, Irwin and Thomas. Nays: None. Motion carried.
Other —
Fire Department Roof Leak — Quote from Lakeshore Construction
Motion by Thomas, supported by Simmons, to authorize Lakeshore Construction to apply a new roof system over the existing roof of the fire department as stated in their January 7, 2019 quote in the amount of $11,298.00 and understanding the drain system needs to be repaired/installed and a bid for the drain repairs will be provided in the next couple of weeks. Roll Call Vote — Ayes: Morlan, Oswalt, Webb, Simmons, Irwin, Thomas and Welburn. Nays: None. Motion carried.
Adjournment:
Motion by Simmons, supported by Irwin, to adjourn at 7:48 p.m. Ayes: All. Nays: None. Motion passed.
) Z, Le
Ronald Welburn
Village President
Page 3 of 3
Text extracted from the official record; formatting may differ.