Page 1
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
President Ronald Welburn called the regular meeting of the Marcellus Village Council to
order on July 28, 2020 at 7:00 p.m. Trustees present: Simmons, Irwin, Thomas, Morlan, and Webb. Trustee Oswalt was absent. Trustee Morlan left the meeting at 8:37 p.m.
Agenda
Motion by Simmons, seconded by Morlan, to approve the agenda as presented. Ayes: All. Nays: None. Motion carried.
Minutes
Motion by Webb, seconded by Simmons, to approve and place on file the minutes of the July 09, 2020, Special Meeting and the July 14, 2020, Regular Meeting. Ayes: All. Nays: None. Motion carried.
Bills
Motion by Morlan, supported by Simmons, to authorize the payment of bills in the
amount of $47,047.64. Roll call vote — Ayes: Irwin, Thomas, Welburn, Morlan, Oswalt, Webb and Simmons. Nays: None. Motion carried.
Consent Agenda
Motion by Webb, supported by Morlan, to receive and place on file all items on the Consent Agenda. Ayes: All. Nays: None. Motion carried.
Ryan Marschke - Hungerford Nichols 2018 Audit Report
Staff Accountant Ryan Marschke, of Hungerford Nichols, provided the Village Council with a brief synopsis of the 2019 audit, noting the following:
1. The Village is in good financial condition at the end of 2019. Council members were reminded to proceed cautiously considering reduced revenues being projected from the State of Michigan for both the General Fund Revenue Sharing payments and Act 51 Major and Local Street Fund payments.
2. The Sewer Fund again saw a net decrease in fund balance with a change in net position of ($22,643). Clerk Terrill noted the Sewer rates were increased in December 2019 based on the preliminary draft rate study of the Sewer Fund performed by Matt Feldpausch of Baker Tilly Municipal Advisors, LLC. The increase in rates should allow the Village to pay for operations and maintenance along with its current debt without a declining fund balance.
3. The Village continues to rely on the auditor for audit adjustments to bring the balances to modified or full accrual basis of accounting, as required by Michigan
Page 1 0f 6
Page 2
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
governmental accounting standards. Management was not able to correct this error with its current accounting procedures as there is a lack of reconciliation of year-end revenue adjustments and receivables. Without these adjustments, the financial statements would have been materially misstated. It is recommended that the Village reconcile related balance sheet accounts, review subsequent receipts that might relate to the fiscal year, and record the necessary year-end accruals and adjustments.
Frank Renaldi— Wightman & Associates
SAW Update
Frank Renaldi, of Wightman & Associates, Inc., updated the Village Council on the SAW grant activities and stated the Village is getting close to capacity in the two lagoons and therefore, in need of an additional cell for its sewer lagoon system. Mr. Renaldi stated he had talked with Dale Ehinger, District Engineer at the Water Resources Division/Kalamazoo District Office for the Michigan Department of Environment, Great Lakes, and Energy (EGLE), who oversees the Village's sewer operations and Mr. Ehinger has indicated he would not deny a Village of Marcellus request to add an additional lagoon
Renaldi was questioned regarding the Village's agreement with the Lakes Area Sewer Authority (LASA), which was entered into for the Village to have a backup treatment facility for excess flows of Village wastewater with adequate capacity designed as part of treatment facility to accommodate Village needs for excess flows of effluent.
The Village of Marcellus pays a percentage of costs for the Treatment Facility at approximately $18,000 per year for the Cass County USDA bond contract for a nine percent reserve capacity on 250,000-gallon average daily flow, not to exceed 35 thousand gallons in a 24-hour period. Any discharge over and above 35,000 gallons is subject to a 150% surcharge at the discretion of the LASA plant operator, and flow may then be increased without a surcharge.
In addition, the Village pays for treatment of wastewater at $3.38 per 1,000 gallons of wastewater and effluent from the Village. According to the Village's contract with LASA, that is an estimated rate and costs will be adjusted annually based upon the Village’s actual flow, with necessary adjustments made on January 1 of each year based upon projected costs of operation and maintenance of the treatment facility. Last year, the Village paid $17,991.87 for treatment during the months of April through September.
The Village residents pay for part of LASA’s infrastructure in addition to paying for any needed treatment at the LASA facility at a rate currently set at $4.50 per month.
Mr. Renaldi referenced the 10-States’ Recommended Standards for Wastewater Facilities, with emphasis on three sections:
Page 2 of 6
Page 3
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
93.35 — Number of Cells Required
Ata minimum, a wastewater treatment pond system should consist of three cells designed to facilitate both series and parallel operations. The maximum size of a pond cell should be 40 acres (16 ha). Two-cell systems may be utilized in very small installations where authorized by the regulatory agency.
The original lagoons were constructed long before there was a requirement for a third cell.
93.415 — Freeboard
Minimum freeboard shall be 3 feet (0.9 m). For small systems, 2 feet (0.6 m) may be acceptable.
The Village is considered a small system and two feet are acceptable. 93.416.a — Design Depth
The minimum operating depth should be sufficient to prevent the growth of aquatic plants and damage to the dikes, pond bottom, control structures, aeration equipment, and other appurtenances. In no case shall the minimum pond depth be less than 2 feet (0.6 m).
a. Controlled-Discharge and Flow =-Through Facultative Treatment Pond Systems
The maximum water depth shall be 6 feet (1.8 m) in the primary cells. Greater depths in subsequent cells are permissible, but supplemental aeration or mixing may be necessary.
The Village currently has two feet of sludge storage, a six-foot working depth and two feet of freeboard. When the lagoons were relined, there were no capacity issues. The sludge judging results from Spring 2020 show the Village has plenty of room for sludge.
It was recommended that the Village begin to monitor the discharges from its industries and check for footing drains during the lead service line in-home inspections.
The Village Council and Frank Renaldi discussed the pages from the Sewer System's draft Capital Improvement Plan as provided by Wightman & Associates, Inc., and agreed to the majority of items listed therein and also agreed to remove the coring of the east force main which likely serves to create a problem where there is none.
Page 3 of 6
Page 4
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
The Village Clerk will share the current and 11-year budget projections with Baker Tilly, who will visit the Village again with an updated financial forecast for the Village’s sewer system.
MDOT /Storm System
Mr. Renaldi shared information regarding the Village's Storm Sewer system with the Village Council and an estimate for $225 million in needed storm repairs. He stated there are several water service lines running through the MDOT storm pipes and noted the lake-like appearance of several streets in the Village after a hard rain. He suggested the Village meet with the Cass County Drain Commissioner to discuss ways for the Village to address the drainage problem.
Elm Street Lead Service Line Replacements
The Village Council was reminded that Wightman & Associates, Inc., would begin the Design Engineering for 2021 Elm Street Lead Service Line replacements in the next couple of months.
President's Report DDA
President Welburn reported James R. Thomas, Jr. has been hired to copy the minutes from the two boxes that were dropped off at the Village Hall by DDA Chair Terry Roberts. Mr. Thomas was asked to copy all the documents in the DDA boxes, including the audits, so that DDA information is electronically located at the Village Hall.
Trustee Irwin reported he attended the last DDA meeting on July 16, 2020, held at the Wood Memorial Library in Marcellus and noted the following:
1. The DDA currently has an approximate $130,000.00 balance.
2. The Faith Plastics building has a downspout/flood problem in Building No. 2.
3. DDA approved Option 1 plan to do gutter work, pour concrete, trim trees and
remove bad concrete.
DDA agreed to trim trees along railroad right-of-way.
Grant Applications for Brett Cropsey, Tony Breseman and Christine Sziede were
approved.
6. Andrew Abrams stated he has not received a response from Surf Air Wireless regarding internet in the Village’s downtown and the DDA approved working with MEC on that issue.
ap
President Welburn requested support for a letter from the Village Council to the Village of Marcellus DDA regarding action and approval on the grant application from Terrill’s
Page 4 of 6
Page 5
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
Market that had been hand-delivered to and rejected by the DDA Chair due to the DDA not having a meeting during the COVID-19 shutdown.
Motion by Webb, supported by Irwin, to approve the letter to the DDA from the Village Council. Roll call vote — Ayes: Thomas, Welburn, Webb, Simmons and Irwin. Nays: Morlan. Motion carried.
Resolution 2020-12 for Override of Rollback Provision to Headlee
Motion by Webb, supported by Simmons, to adopt Resolution 2020-12, A Resolution Authorizing an Override of the Rollback Provisions Established Pursuant to the Headlee Tax Limitation Amendment and to Reinstate the Original Authorized Rate in the November 3, General Election.
The Marcellus Village Council has determined that it is in the best interests of the Village if it seeks approval from the voters pursuant to MCL 211.34d to override the rollback of the Village Operating millage rate from the current maximum allowed millage of 9.3026 mills to 12.5 mills; and to override the rollback of the Village Street Improvement millage rate from the current maximum allowed millage of 3.7205 mills to 5.0 mills in the November 3, General Election.
Roll call vote — Ayes: Welburn, Webb, Simmons, Irwin and Thomas. Nays: None. Motion carried.
Railroad Street Property and Quotes for Overhead Door Installation
President Welburn reported there is a possible new tenant for Building 4 at the Railroad Street Property. Bill Beck of Beck's Home Improvement in Marcellus, Michigan, proposes to frame the opening for installation of an overhead door and install a wall similar to the wall installed for the current tenants in the building as a barter exchange ($2,120.00 ) for rental payments until the quoted price of the work is equal to the rental payments. At $224.00 per month, the tenant will begin paying rent on the space at 9.5 months. The overhead door will be installed by Overhead Door Company, of Kalamazoo, and they have agreed to honor the quote given to the Village in February of this year at a cost of $2,299.00, a price which does not include the framing work quoted by Beck's Home Improvement.
Motion by Irwin, supported by Welburn, to approve the barter agreement and lease with Beck's Home Improvement and to approve the quoted price of $2,299.00 from Overhead Door Company to install the overhead door after the frame is built. Roll call vote — Ayes: Webb, Simmons, Irwin, Thomas and Welburn. Nays: None. Motion carried.
Page 5 of 6
Page 6
Regular Meeting July 28, 2020
Village of Marcellus Council Proceedings
Clerk's Report
Ordinance No. 233 — Tree and Brush Pick-up
The discussion on the Tree and Brush Pick-up Ordinance was rescheduled to the August 11, 2020, Village Council meeting
Michigan Security & Lock
Motion by Irwin, supported by Simmons, to approve the quotes from Michigan Security & Lock for replacement of the hinge on the boiler room door at the Village Hall and for the replacement of the entire door and frame at the Fire Department at a cost not to exceed $3,090.96. Roll call vote — Ayes: Simmons, Irwin, Thomas, Welburn and Webb. Nays: None. Motion carried.
DPW
Water Tower Door
Motion by Irwin, supported by Thomas, to approve the DPW purchase and installation of a door at the water tower at a price not to exceed $350.00. Roll call vote — Ayes:
Irwin, Thomas, Welburn, Webb and Simmons. Nays: None. Motion carried.
Adjournment:
Motion by Simmons, supported by Thomas, to adjourn at 9:13 p.m. Ayes: All. Nays: None. Motion passed.
lu@lirfe A. Terrill Ronald Welburn Village Clerk Village President
Page 6 of 6
Text extracted from the official record; formatting may differ.