Page 1
Regular Meeting December 22, 2020
Village of Marcellus Council Proceedings
President Welburn called the regular meeting of the Marcellus Village Council to order on December 8, 2020 at 7:00 p.m. at the Hudson Memorial Building. Trustees present: Simmons, Irwin, Thomas, Breseman, Oswalt and Webb.
Agenda
Motion by Simmons, seconded by Oswalt, to approve the agenda with the following addition:
Under President’s Report — Add Item D. Fire at Faith Plastics Ayes: All. Nays: None. Motion carried. Minutes Motion by Webb, supported by Oswalt, to approve and place on file the minutes of the December 8, 2020 Regular Meeting and the December 15, 2020 Special Meeting. Ayes: All. Nays: None. Motion carried. Bills Motion by Simmons, supported by Irwin, to authorize the payment of bills in the amount
of $73,579.94. Roll call vote — Ayes: Irwin, Thomas, Welburn, Breseman, Oswalt, Webb, and Simmons. Nays: None. Motion carried.
Consent Agenda
Motion by Webb, supported by Welburn, to receive and place on file all items on the Consent Agenda. Ayes: All. Nays: None. Motion carried.
Frank Renaldi and Frank Lapierre — Wightman & Associates, Inc., Storm and Wastewater (SAW) Report
Frank Renaldi of Wightman & Associates, Inc., presented the final Stormwater Asset Management Plan (SWAMP), sharing that the Village’s Stormwater system is in poor condition and the entire system needs replacement. The Village will need to find a way to fund the remaining items in the Capital Improvement Plan (CIP) and will need to consider how it will fund the much-needed Stormwater improvements not included in this CIP.
He reminded the Village Council that the Village Clerk had submitted a grant application to MDARD on November 19, 2020. If granted, these funds will help with a some of the Capital Improvement items noted in the SWAMP.
Mr. Renaldi then shared the final Wastewater Asset Management Plan (WWAMP), noting the Village’s Wastewater system is in good condition, pointing out that the lagoons are in good shape, but that could change in the next 15 to 20 years or if the
Page 1 of 5
Page 2
Regular Meeting December 22, 2020
Village of Marcellus Council Proceedings
State of Michigan should make any mandates regarding wastewater lagoons such as it did with the Lead and Copper replacement requirements. Such a change could necessitate an additional lagoon or some other type of agreement with the Lakes Area Sewer Authority (LASA).
The items on the CIP for the Wastewater system were included in the November 19, 2020 grant application to MDARD. If granted, those items scheduled for completion in 2022 would move to 2021.
Trustee Irwin expressed his concern regarding the GIS location work completed by Corby Energy Services, Inc. of Detroit, Michigan (CES) due to the problems encountered when the Village hired Peters Construction Co., of Kalamazoo, Michigan, to raise the stormwater manhole at the corner of West Main and North Jones Streets. Renaldi stated the locations should be accurate and that he shares Trustee Irwin's concerns. He will verify with CES.
Motion by Webb, supported by Thomas, to approve the SWAMP and the WWAMP as presented and authorizing the Village Clerk and/or Village President to sign and file
them with EGLE the Certification of Project Completion. Roll call vote — Ayes: Thomas, Welburn, Breseman, Oswalt, Webb, Simmons and Irwin. Nays: None. Motion carried.
Frank Renaldi — Drinking Water Asset Management (DWAM) Grant Application for Equipment and LCR Investigations/Distribution Materials Inventory
Frank Renaldi shared that the Village of Marcellus is eligible to apply for a grant from the Michigan Department of Environment, Great Lakes, and Energy (EGLE) for its community water supply system's distribution system materials inventory and equipment. If the Village applies for and receives the reimbursing grant, the total cost to the Village is estimated to be $6,400.00, 75% of the cost for equipment only. The remaining estimated costs of $216,210.00 for the LCR investigations would be reimbursed at 100% by EGLE.
Motion by Irwin, supported by Simmons, to authorize the Village Clerk to work with Wightman & Associates, Inc., on and authorizing the Village President to sign the certification for the grant application to EGLE for Equipment and LCR Investigations/Distribution Materials Inventory. Roll call vote - Ayes: Welburn, Breseman, Oswalt, Webb, Simmons, Irwin and Thomas. Nays: None. Motion carried.
Frank Renaldi—LSL vs Full System CIP
Frank Renaldi again addressed the Village Council regarding the previously approved AMP for the Village’s Water Supply System. The Village Council previously reviewed a “Full-System” AMP which included a CIP with lead service line replacements (LSL) and pumphouse restoration in addition to replacements for the old cast iron water mains. In addition, the Council reviewed an AMP that included a CIP with lead service line replacements and pumphouse rehabilitation only. On January 28, 2020, the Village Council approved the Water AMP prepared by Wightman & Associates, Inc., with the
Page 2 of 5
Page 3
Regular Meeting December 22, 2020
Village of Marcellus Council Proceedings
lead service line replacements and pumphouse restoration only due to the lack of funds and affordability for replacing water mains. He explained that for the Village to apply for funding from the State of Michigan's State Drinking Water Revolving Fund (SDWRF) for the Full-System CIP, the Council would first need to approve that CIP, with the intention of applying for funding for the full-system and reverting to the LSL replacements and pumphouse restoration only, if the Village does not receive a favorable funding offer.
Motion by Thomas, supported by Welburn, approve the Full-System CIP, for application to SDWRF, contingent upon receiving favorable funding in the form of loan forgiveness. If the Village does not receive a favorable offer, it will revert to the CIP with the LSL replacements and pumphouse restoration only. Roll call vote — Ayes: Breseman, Oswalt, Webb, Simmons, Irwin, Thomas and Welburn. Nays: None. Motion carried.
Budget Hearing:
Motion by Simmons, supported by Thomas, to recess the regular Village Council meeting and open the Budget Public Hearing at 7:30 p.m. Ayes: All. Nays: None. Motion carried. The Village Council discussed the proposed revised 2020 and 2021 Village Budgets presented for all funds and asked for input from the Village residents in attendance. There were no comments from the public. Motion by Simmons, supported by Thomas, to close the Public Hearing and return to the regular session at 7:45 p.m. Ayes: All. Nays: None. Motion carried.
Resumption of Reqular Session:
Approval and Adoption of 2020 Budget Amendments and 2021 Budgets for All Funds
Following discussion regarding the minor changes made to the budgets since the last Budget Workshop meeting of the Village Council members for the 2020 Village Budget amendments for all funds, Simmons moved, supported by Thomas, to approve and adopt the proposed 2020 Budget amendments for all Village funds as presented and the proposed 2021 Budgets for all funds as presented. Roll call vote — Ayes: Oswalt, Webb, Simmons, Irwin, Thomas, Welburn and Breseman. Nays: None. Motion carried.
President's Report 2020 MAESA Budget Amendments and 2021 MAESA Budget
Trustee Simmons shared a copy of the 2020 proposed MAESA Board budget amendments and their proposed 2021 budget which were approved by the MAESA Board on December 14, 2020.
Motion by Oswalt, supported by Welburn, to approve the 2020 MAESA budget amendments and the 2021 MAESA budget as presented to the Village Council. Roll call vote — Ayes: Webb, Simmons, Irwin, Thomas, Welburn, Breseman and Oswalt. Nays: None. Motion carried.
Page 3 of 5
Page 4
Regular Meeting December 22, 2020
Village of Marcellus Council Proceedings
Andrew Abrams DDA Resignation Letter
Motion by Webb, supported by Welburn, to accept with thanks for his years of service, Andrew Abrams resignation from the DDA and authorize the Clerk to advertise for applications to fill the vacancy in The Marcellus News. Roll call vote — Ayes: Simmons, Irwin, Thomas, Welburn, Breseman, Oswalt and Webb. Nays: None. Motion carried.
November 28, 2020, Fire at Faith Plastics and Subsequent Remediation Work and Repair, Possible Effect on Future Village Fire and Casualty Insurance Premiums
President Welburn reported one of the machines at Faith Plastics caught fire on November 28, 2020. The fire caused a significant amount of smoke damage and potentially damaged some lighting above the machine that caught fire. The Village’s insurance agent is working with VanDam and Krusinga Building and Restoration, of Kalamazoo, Michigan on the clean-up. Welburn warned that the claim for cleanup is extensive and there may be consequences affecting the Village’s insurance premiums at the next renewal.
Clerk's Report
Ordinance No. 235 — Wastewater Removal and Treatment Ordinance
Motion by Webb, supported by Welburn, to adopt and approve, with amendments, Ordinance No. 235, Wastewater Removal and Treatment Ordinance, and to publish the same in full or in summary in The Marcellus News with an effective date of January 20, 2021. Roll call vote — Ayes: Irwin, Thomas, Welburn, Breseman, Oswalt, Webb and Simmons. Nays: None. Motion carried.
DPW
West Lift Station Generator
Trustee Irwin reported the replacement generator for the Village’s West Lift Station has been ordered and is scheduled for shipment March 18, 2021.
OTHER Personnel Committee
Elton Hackenberg Pay Proposal for 2021
Motion by Irwin, supported by Simmons, to renew on a month-to-month basis, the contract with Elton Hackenberg for part-time employment with the Village at the rate of $40.00 per hour and $100.00 per month for one water license from January 1, 2021 through December 31, 2021 and automatically renewing unless cancelled by either party. Roll call vote: - Ayes: Thomas, Welburn, Oswalt, Webb, Simmons and Irwin. Nays: None. Motion carried.
Page 4 of 5
Page 5
Regular Meeting December 22, 2020
Village of Marcellus Council Proceedings
Public Comment
Proposed Ernest Porath, Jr., Memorial Bench for Village Commons Park
President Welburn shared a request from the family of Emest (Ernie) Porath, Jr., for the installation of a memorial bench in the Village Commons Park. Motion by Welburn, supported by Thomas, to approve the installation of the bench at a cost not to exceed $500.00 after January 1, 2021. Roll call vote — Ayes: Welburn, Breseman, Oswalt, Webb, Simmons, Inwin and Thomas. Nays: None. Motion carried.
Rick Anstiss Request for Approval of a Hemp and Harvest Festival in the Village
Rick Anstiss addressed the Village Council, introducing himself and informing the Council that he would like to introduce the possibility of a hemp and harvest festival in the Village of Marcellus and he will call to request he be added to a future agenda so that he may give a presentation to the Council.
Adjournment:
Motion by Simmons, supported by Oswalt, to adjourn at 8:11 p.m. Ayes: All. Nays: None. Motion passed.
Baral) tid ble Ronald Welburn Village President
Page 5 of 5